PROJECT DATA

Safety First. Careful Timing.
MEVA Formwork Solution.

Project: Medical Center - Miami Valley Hospital - in Dayton, OH, 5 cores

Contractor: Baker Concrete

MEVA Systems: Heavy-duty wall formwork Imperial and leight-weight wall formwork MevaLite, Climbing Scaffold KLK, Shoring System MEP

Formwork Engineering: MEVA Formwork Systems, Springfield, OH

 
 
1
2
3
 

Project

MEVA Formwork Solution for Medical Center Dayton, OH

Building the five new cores that form the heart of Dayton´s Miami Valley Hospital presented a true scheduling challenge: They had to be erected simultaneously to keep ahead of the structural steel. 

Since the rebar content was very dense, the supervisors had to take great care to tie in with the structural iron.

The configuration of the cores required extra decking to be provided by MEVA and custom parts were required to solve the issues with erecting the formwork. 

MEVA engineers provided a safe working platform using the climbing platform KLK and MEVA flipper locks.