PROJECT DATA

Superior Finish on 30’ High Walls for Limestone Storage Facility

Project: Limestone Storage Facility, Piqua Materials, Piqua, OH
Building size 130' x 84'

Contractor: Kapp Construction, Springfield, OH

MEVA Systems: Wall Formwork Imperial

Specifications: The MEVA Imperial formwork system was able to accommodate for the 30’ tall walls with multiple top of wall steps and buttresses. The main challenge with this project was using the external vibrators to ensure a quality concrete finish.

Engineering: MEVA Formwork Systems, Springfield, OH

 
 
1
2
 
  • MEVA Vakkennis & Referenties

    MEVA Vakkennis & Referenties

    Referenties over projecten in de utiliteits- en woningbouw, de hoogbouw, de constructiebouw und constructiebouw

  • Wiener Neustadt

    Wiener Neustadt

    Op- en afritten, wanden en vloeren in zichtbeton, veel balken, hoekige en ovale kolommen van zichtbeton, afgeronde buitenhoeken en afgeschuinde binnenhoeken.

  • Megaproject noordelijke rondweg

    Megaproject noordelijke rondweg

    De streek rond Zürich vormt een kruispunt van snelwegen uit alle richtingen. Deze dichtbevolkte regio heeft elke ochtend en avond niet alleen te maken met dicht transito- en doorgaand verkeer, maar ook met pendelverkeer.

  • Het “Jugendhaus” in Biberach

    Het “Jugendhaus” in Biberach

    Vloerhoogten van 2,90 m tot 5,80 m, afgeschuinde wanden voor schuin aflopende platte daken, stompe hoeken bij de binnenen buitenwanden: bij het nieuwe “Jugendhaus” in het Duitse plaatsje Biberach vereiste de complexe geometrie het vakmanschap van de MEVA bekistingsplanners en de bouwonderneming.

Bekistinsplaat Volkunststofplaat alkus
MEVA Raamprofiel
... meer dan alleen bekisting
  •  Kies een taal

    Kies uw werelddeel en land Kies een taal (optioneel).

  •  Contact
  •  Zoek

    Zoek op onze site.

  •  Newsletter

    Ontvang elke maand onze newsletter.