PROJECT DATA

Bridgestone Tire´s world headquarters
with Imperial, KLK and MEP

Project:  Bridgestone Headquarters, Akron, Ohio
Wall height: 20 ft, Core height: 62 ft

Contractor: Givens Construction

MEVA Systems: MEVA wall formwork Imperial, working scaffold KLK, shoring system MEP

Engineering: MEVA Formwork Systems, Springfield, OH

 
 
1
2
3
 

Project

Superintendent Mike Demos looks to MEVA for Formwork Solutions on Tough Jobs

On parts of the building the architect required an architectural finish using colored concrete – easily achieved with the Imperial wall formwork and its all-plastic, 100 % wood-free facing alkus. Three cores and one shear wall required the climbing scaffold KLK. Each core was poured in several
16’-0 high lifts. 

Superintendent Mike Demos: “Imperial is a quick, efficient system. We poured 20’-0 walls in less than two hours. Impressive! Although we´ve never used a jump forming system, the KLK proved to be amazingly simple and easy to learn.“

 
Bekistinsplaat Volkunststofplaat alkus
MEVA Raamprofiel
... meer dan alleen bekisting
  •  Kies een taal

    Kies uw werelddeel en land Kies een taal (optioneel).

  •  Contact
  •  Zoek

    Zoek op onze site.

  •  Newsletter

    Ontvang elke maand onze newsletter.